raytownonline_circle

Raytown current weather conditions


Click for Forecast

Weather Forecast

Clear
Wednesday 0%
High 38° / Low 23°
Clear
Sunny skies. High 38F. Winds light and variable.
Clear
Thursday 10%
High 48° / Low 32°
Clear
Mainly sunny. High 48F. Winds SSW at 5 to 10 mph.
Clear
Friday 10%
High 52° / Low 33°
Clear
Mainly sunny. High 52F. Winds light and variable.
Overcast
Saturday 20%
High 44° / Low 26°
Overcast
Cloudy. A shower of rain or wet snow possible. High 44F. Winds NE at 10 to 15 mph.
Snow Showers
Sunday 30%
High 36° / Low 24°
Snow Showers
Scattered snow flurries and snow showers before noon. Becoming partly cloudy later. High 36F. Winds N at 5 to 10 mph. Chance of snow 30%.
Clear
Monday 10%
High 45° / Low 32°
Clear
A mainly sunny sky. High near 45F. Winds SW at 10 to 15 mph.
Clear
Tuesday 10%
High 51° / Low 35°
Clear
A mainly sunny sky. High 51F. Winds SW at 5 to 10 mph.

Clark’s Appliances donated to REAP


DAILY CARTOON click to enlarge
ANDERTOONS.COM DAILY CARTOONS
=

Click on +1 button to tell Google you like RaytownOnline

Subscribe to RaytownOnline.com via Email

Enter your email address to receive emails of the latest local news articles on RaytownOnline.com.


Raytown Service Specialist donated to REAP





Kendra donated to Shepherd’s Center

Ads for Charity

City Administrator’s Report for 4/18/2014

City Administrator’s Report
FROM: Mahesh Sharma, City Administrator

 Public Works
Google Fiber will have three crews in the City next week to start the task of installing permanent repairs for the many street cuts. The contractor anticipates several weeks before the work will be complete.
Public Works has closed 82nd Street from Elm to Ditzler to through traffic to perform major roadway repair. The adjacent home owners can still access their property along the roadway. The road has significantly deteriorated as a result of the 83rd Street detour. The increased traffic from the detour accelerated the deterioration of the street and public works needs to perform major repairs to provide a safe roadway. Once the road is deemed safe for all traffic the street will be reopened. The repairs will be temporary as Public Water District #2 is planning to replace the nearby water main. Once the utility work is complete a permanent reconstruction of the roadway will be completed.
Board, Committee and Commission Meetings, and Events
April 21 – Municipal Court – 6:00 p.m.

Leave a Reply